TEICHMANN CRANES prepares transport of modernized components of the double level luffing jib crane

To be able to hand over the crane to its new owner still before Christmas and to ensure that crane assembly could proceed as planned, this week at the TEICHMANN location in Essen the manufactured pendulum support, the workshop-overhauled crane driver’s cabin and the engine house were already prepared for their transport to Königs Wusterhausen and picked up by the forwarder.

The crane is equipped with a spreader and gripping tongs and after its reassembly it will be used for container handling.


Back