Technical information

1 Crane cabin in as new condition


Make EDRINGER
Access on the right and on the left side
Access platform available
Attachment of cabin suspended
Windows Double glazing, tinted
Thermal insulation available
Control stand turnable
Air conditioning available
Hinged window in the front
Year of construction 2003
Technical drawing available

Description

Reconstruction and modernization possible on request

Inquire now