Technical information

Gauge
41 m

Span currently approx. 41,0 m

Jib length swing leg approx. 9,0 m

                  fixed leg approx. 7,0 m

Lifting height/hook path approx. 11,0/20,0 m

Reconstruction TEICHMANN

Year of reconstruction 2021

Description

Crane equipped with:

  • robust double-rail open winch trolley in four-rope grab version,
  • crane travel gear as two-wheel swing ger for more favourable wheel load distribution
  • renewal of the complete wiring and general revision of electric control
  • on-board cabin control (upgrade to radio control possible)
Inquire now