At the closed mine in Ibbenbüren, one of the last German hard coal mines, a 7.4 km long tunnel is being built for the discharge of the emerging mine water. For this purpose, TEICHMANN CRANES delivered a 60t gantry crane in just 3 months.
For the renovation of the 100-year-old glass roof at Berlin's third largest train station, the TeichmannGroup manufactured and assembled a 121 m long gantry crane with a lifting height of 33.5 m. The limited space and assembly conditions in the middle of Berlin city as well as the strictest safety requirements in the manufacturing process made this project a very unique one.
For the construction of the new highspeed rail network "Highspeed 2" connecting the cities London, Birmingham, Manchester and Leeds TEICHMANN CRANES delivered several cranes to the U.K..