TeichmannGroup modernizes Overhead Travelling Crane for an international Heavy Cargo Logistics Company

The crane was transported to Essen for adaptation of span where the affiliated company TEICHMANN CRANES made the shortening of the steel construction. After conclusion of the works on the steel construction the crane components were provided with a primer coat in bright orange colour.

The crane is equipped with a rotating trolley with 2 electric wire rope hoists having a hook distance of approximately 1.800 mm. Furthermore it is equipped with a radio remote control with command function for the magnetic control and with a one-sided walkway along the crane bridge.

Thanks to the smooth cooperation between TEICHMANN CRANES and Cranetech there was nothing standing in the way of the timely delivery and assembly of the crane.


Back